mahendras

Subscribe Mahendras Youtube Channel | Join Mahendras Telegram Channel | Like Mahendras Facebook Page | Online Admission | Download Mahendras App

Now Subscribe for Free videos

Subscribe Now

SSC CGL & CHSL Quiz : Quantitative Aptitude | 29-12-19

Durgesh Mahendras
SSC CGL & CHSL Quiz : Quantitative Aptitude | 29-12-19


As SSC CGL notification is out and candidates have started their preparation for this exam. Mahendras also has started special quizzes for this examination. This series of the quizzes is based on the latest pattern of the SSC CGL examination. Regular practice of the questions included in the quizzes will boost up your preparations and it will be very helpful in scoring good marks in the examination.



Q.1:-  The value of / का मान SSC-CGL-MATHS-QUIZ-29-12-19 is/ है ?

(1) 13/ 4
(2) 11/4
(3) 15/4
(4) None of these/ इनमे से कोई नही

Q.2:-If/ यदि a + b + c = 6 and ab + bc + ca = 5 then what is the value of/ का मान क्या होगा  SSC-CGL-MATHS-QUIZ-29-12-19 = ?

(1) 123
(2) 126
(3) 196
(4) 98

Q.3:- if SSC-CGL-MATHS-QUIZ-29-12-19

(1) SSC-CGL-MATHS-QUIZ-29-12-19
(2) SSC-CGL-MATHS-QUIZ-29-12-19
(3)SSC-CGL-MATHS-QUIZ-29-12-19
(4) SSC-CGL-MATHS-QUIZ-29-12-19

Q.4:- 5 cube each of edge 6 cm are put together to form a cuboid. What is the ratio of total surface area of cuboid and surface area of 3 cubes.

5 एक सामान घन जिसकी भुजा 5 सेमी है को एक साथ रख कर एक घनाभ बनाया जात है. घनाभ और 3 घनों के सम्पूर्ण पृष्ठ के क्षेत्रफलों का अनुपात क्या होगा?

(1) 12 : 17
(2) 13 : 9
(3) 9 : 13
(4) 12 : 11

Q.5:- Efficiency of A, B, and C are in the ratio 5 : 6 : 9. If working together the can complete 55% of the work in 11 days. In how many days A and B together can complete the 33% of the work in?

A, B और C की क्षमताओं का अनुपात 5 : 6 : 7. यदि एक साथ काम करते हुए तीनो 55% काम को 11 दिन में समाप्त करते है तो A और B मिलकर उसी का के 33% को कितने दिन में समाप्त करेंगे?

(1) 8 days
(2) 10 days
(3) 12 days
(4) 14 days

Q.6:- if/ यदि  SSC-CGL-MATHS-QUIZ-29-12-19 and/ और a + b  = 28 then find the value of / का मान ज्ञात करें SSC-CGL-MATHS-QUIZ-29-12-19 = ?

(1) 208
(2) 108
(3) 228
(4) 238

Q.7:- Average of 18 number is 52. Average of first 8 number is 62 and next seven is 45. If 16th number is 6 less than 17th number and 17th number is 1 more than the 18th number. Then what is the average of 16th and 18th number?

18 संख्याओं का औसत 52 है. प्रथम 8 संख्याओं का औसत 62 है और अगली 7 संख्यों का औसत 45 है. यदि 16 वीं संख्या 17 वीं संख्या से 6 कम है और 17 वी संख्या 18 से 1 अधिक है तो 16 वी और 18 वीं संख्या का औसत क्या होगा?

(1) 41
(2) 43.5
(3) 38
(4) 40.5

Q.8 A and B can complete the piece of work in 15 days and 10 days respectively. They got a contract to complete the work for ₹35000. The share of A (in ₹) in the contract money will be?

A और B क्रमशः 15 दिनों और 10 दिनों में काम पूरा कर सकते हैं। उन्हें काम पूरा करने के लिए ₹ 35000 का कॉन्ट्रैक्ट मिला। कॉन्ट्रैक्ट मनी में A (₹ में) का हिस्सा होगा?


(1) ₹ 15000
(2) ₹14000
(3) ₹21000
(4) ₹7000

Q.9. Chrods AB and CD of a circle intersect externally at P. AB= 6 cm,. CD = 3 cm and PB= 4 cm, then find the length (in cm) of PD is?

एक वृत्त की जीवा AB और CD आपस में बिंदु P अन्तः प्रतिच्छेदित करती है,
AB = 6 सेमी, CD = 3 सेमी  और PB= 4 सेमी है तो PD ( सेमी में ) की लम्बाई क्या क्या होगी ?

(A) 5
(B) 6
(C) 2
(D) 7

Q.10 If each side of a rectangle is increased by 13%, then its area will increased by?

यदि आयत की प्रत्येक भुजा में 13% की वृद्धि हुई है
, तो इसका क्षेत्रफल बढ़ेगा?

(A) 21.69%
(B) 13%
(C) 27.69%
(D) 26%














Answer:-

1.Sol:- (1)
SSC-CGL-MATHS-QUIZ-29-12-19
SSC-CGL-MATHS-QUIZ-29-12-19
13/4

2. Sol: - (2)

SSC-CGL-MATHS-QUIZ-29-12-19 = SSC-CGL-MATHS-QUIZ-29-12-19
SSC-CGL-MATHS-QUIZ-29-12-19 = 6 x (36 – 15) = 126

3.Sol:- (4)

2x + 3 + x – 8 + x + 13 = 0
= x = -2
SSC-CGL-MATHS-QUIZ-29-12-19 = SSC-CGL-MATHS-QUIZ-29-12-19

4. Sol:-

Length of cuboid = 30 cm
Breadth and height of cuboid = 5cm
Total surface area = 2 ( 150 + 25 + 150)
= 650
Total surface area of cube =  6 x 25 = 150
3 cubes =  3 x 150 =  450
Required ratio = 650 : 450
= 13 : 9

5.Sol:- (3)

Total work = SSC-CGL-MATHS-QUIZ-29-12-19
33%Work done by A and B = SSC-CGL-MATHS-QUIZ-29-12-19 =  12 days


6.Sol:-  (1)

SSC-CGL-MATHS-QUIZ-29-12-19
5924 = 28 SSC-CGL-MATHS-QUIZ-29-12-19
SSC-CGL-MATHS-QUIZ-29-12-19 = 208

7.Sol:- (4)

Sum of 18 numbers = 18 x  52 = 936
Sum of first  8 number = 496
Sum next seven number = 315
Sum of remaining number = 936 – 496 – 315 = 125
ATQ,
= x + x + 6 + x + 5 = 125
3x =125 – 11
X =  38
Required average = 38 + 2.5 = 40.5

8 Sol. (3)

Ratio of share = 3 : 2
A's share SSC-CGL-MATHS-QUIZ-29-12-19

9. Sol. (A)

PA×PB  =  PC× PD
(6+4)×4 = (3+PD)×PD
PD=5

10. Sol. (C)

=13+13+1.69
=27.69%

0 comments:

Post a Comment

MAHENDRA GURU

Copyright © 2023 www.mahendraguru.com All Right Reserved by Mahendra Educational Pvt . Ltd.